Operating Guide

💡Flow Power vs Amber Electric & LocalVolts guides

This Operating Guide is specifically for Flow Power customers. If you are an Amber Electric or LocalVolts customer, please refer to the appropriate Operating Guide.

The following outlines how to configure Energy Manager to do exactly what you want. It is very customisable but the defaults should suit most use cases - however you should confirm the defaults do suit your situation. What is optimal for you may not be optimal for someone else due to a number of aspects, including solar array size, inverter rating, battery size, and your mindset on how aggressive you would like to trade. You should closely watch how your system behaves when you first enable the Energy Manager to make sure that it is working appropriately for you.


ℹ️1. Basic Principles

Read about the Basic Principles of energy management.

ℹ️2. How to Control Energy Manager

Details on how to enable or disable Energy Manager

ℹ️3. Energy Manager Settings - Flow Power Specific

Details on how to configure Flow Power Specific settings [Premium]

ℹ️4. Energy Manager Settings - Inverter Settings

Details on how to configure the Inverter tab settings

ℹ️5. Energy Manager Settings - Exclusion period

Details on how to configure the Exclusion Period

ℹ️6. Energy Manager Dashboards

Details on various dashboards included with Energy Manager

💡7. Recommended commissioning approach

Once everything above has been configured to your personal requirements, the following is the recommended commissioning approach

💡8. Decision reference guide

Take a read of the decision reference guide if you are wanting to understand what the decisions mean that come back from the Energy Manager servers.